Leach Structural Steelwork Optimizes Fabrication with Accurate and On-time Information
Leach Structural Steelwork uses the Tekla model for all phases of the business: from concept models to tendering and through the design detailing phase.
Read Article
3D Modeling has been a Powerful Tool for Detailers, Designers and Contractors
The most advanced 3D modeling system for steel structures is Tekla Structures - a solution that gives you the power and flexibility to tackle any type of detailing project.
Read Article
Wembley Stadium: From 160 Phase Models to a Single BIM
The models were subsequently split into 160 phase models before being brought back into a single building information model (BIM) at the end of the project.
Read Article
Swansea's Port Tawe Sail Bridge Project Completed in Less than 15 Months with the Help of Tekla Structures
Read Article
Unger Steel Overcomes Challenges with Tekla and Trimble
Unger Steel Group utilized Tekla BIM software in a very advanced way to plan, produce and assemble the diamond trusses of the architecturally stunning roof of Vienna Central Railway Station
Read Article
Dynamic Structural Steel: Startling Success Largely Due to Having the Latest BIM Technology
Because the fabricators are working with the real as-built model, there is less chance of error. We’re simply more efficient which means a faster construction process.
Read Article
Denver Art Museum Expansion: From Accurate Detailing to Smooth Erection
The plans called for transforming more than 2,700 tons of steel into a complicated skeleton that would support and create oblique angles.
Read Article
Sorbonne University: Productivity, Efficiency and Accuracy Dramatically Increased with BIM
Coordination between us, the main contractor, and the steel and façade subcontractors was a challenge that we overcame.
Read Article
Bridges: Linking Together
Challenges posed by the construction – and indeed maintenance – of bridges demand collaboration and are pushing contractors and equipment manufacturers to innovate in different ways.
Read Article
BIM Contributes to World Cup
The Mordovia Arena, one of the venues for the 2018 FIFA World Cup, was completed to a tight timescale thanks to BIM being used on the project.
Read Article
How Estimodeling Saved Time and Improved Accuracy in Ski Dubai Detailing
Faster product development, lower cost, and improved productivity are issues addressed by Tiger Steel.
Read Article
Saipem Oversees Entire Offshore Projects with BIM
The most significant benefit is the availability of a single structural model from which we can extract project plans and detailing, lists of materials, weights and centers of gravity.
Read Article
Quatre-Temps Commercial Center: Gagne Used Tekla Structures Software to Model Complex Frameworks
Gagne needed software to model complex frameworks (3 items modeled simultaneously), thus ensuring highly effective detailing and optimized fabrication of this exceptional structure.
Read Article
The PGE Arena in Gdansk: A Sports Arena Modeled Using Tekla BIM Software
BIM enabled us to optimize both time and materials and tackle assembly challenges before entering the site.
Read Article
Peace Bridge: BIM helped Rowecord with Complex Geometry, Off-site Building and Even Transportation
The accuracy of the model and the control over the geometry during fabrication and erection were major contributors to the success of the Peace Bridge project.
Read Article
Panorama Tower - Reliable Modeling Helps to Avoid Mistakes
A number of new functions were utilized in the building information modeling environment implemented in the structural design to seek efficiency in both the site functions and building cost factors.
Read Article
Modeling the Steel Structures of North East Tower (NET) Center with Tekla Structures Helped Achieve Architectural Objectives
The major improvements has been the increased quality of their work due to the absence of errors, an increase in precision and efficiency, and a reduction in turn-around times for their projects.
Read Article