Description for BIM. What is BIM? Why BIM? What's BIM got to do with it?

  • Recreation Center Flamingo: BIM Adds Momentum to the Construction Site of the Year

    Recreation Center Flamingo: BIM Adds Momentum to the Construction Site of the Year

    Production planning and utilization of the building’s information model (BIM) have been exemplary throughout the project.

    Read Article
  • Puuvilla: From Factory to Shopping Center with BIM collaboration

    Puuvilla: From Factory to Shopping Center with BIM collaboration

    The precast concrete provider Parma faced a very tight schedule, a challenge which they tackled with collaboration, design, detailing and production status management and model information.

    Read Article
  • Pushing BIM into the Field

    Pushing BIM into the Field

    Valuable time and accuracy can be lost by manually scaling distances, calculating angles from plans, turning angles with theodolites, and pulling tapes to measure distances.

    Read Article
  • PTDC Logistics Center Project has Made Extensive Use of BIM Throughout the Supply Chain

    PTDC Logistics Center Project has Made Extensive Use of BIM Throughout the Supply Chain

    The model enabled us to forecast and manage element deliveries and to check the status in real time, so we knew whether we were will be able to install the element on time.

    Read Article
  • Project OVE:  Arup's 170-meter-tall BIM man

    Project OVE:  Arup's 170-meter-tall BIM man

    OVE is the embodiment of implementing BIM to construction projects with elaborate geometries, unorthodox design challenges and unique aesthetics.

    Read Article
  • The PGE Arena in Gdansk: A Sports Arena Modeled Using Tekla BIM Software

    The PGE Arena in Gdansk: A Sports Arena Modeled Using Tekla BIM Software

    BIM enabled us to optimize both time and materials and tackle assembly challenges before entering the site.

    Read Article
  • Peace Bridge: BIM helped Rowecord with Complex Geometry, Off-site Building and Even Transportation

    Peace Bridge: BIM helped Rowecord with Complex Geometry, Off-site Building and Even Transportation

    The accuracy of the model and the control over the geometry during fabrication and erection were major contributors to the success of the Peace Bridge project.

    Read Article
  • No Blue Planet without Building Information Modeling

    No Blue Planet without Building Information Modeling

    With 3D modeling, all parties are involved in creating the design of the project in a completely new way. This leads to a deeper understanding of the project, which improves the quality.

    Read Article
  • Neste Oil Diesel Production Line Pioneered Work on Utilizing BIM

    Neste Oil Diesel Production Line Pioneered Work on Utilizing BIM

    The Diesel project pioneered work on utilizing BIM for creating industrial concrete structures and intelligent data transfer between systems enabled parallel progress in plant and structural design.

    Read Article
  • Use of BIM on a Construction Site was Put to the Test with a Jumbo Shopping Center Extension

    Use of BIM on a Construction Site was Put to the Test with a Jumbo Shopping Center Extension

    A tight timetable meant that the design, purchasing, prefabrication and site activities ran very much in parallel.

    Read Article
  • Hotel Hilton, Helsinki-Vantaa Airport: BIM Improves the Quality of Construction

    Hotel Hilton, Helsinki-Vantaa Airport: BIM Improves the Quality of Construction

    The 3D representations and printouts created from the model facilitate and speed up decision-making at the design stage.

    Read Article
  • Heembeton Uses Tekla Structures BIM Software to Speed Up Their Design-To-Manufacture Process

    Heembeton Uses Tekla Structures BIM Software to Speed Up Their Design-To-Manufacture Process

    Tekla Structures is an open system that enables brisk development for the precast industry.

    Read Article
  • Global BIM Collaboration Creates the Massive Baku Stadium in 18 Months

    Global BIM Collaboration Creates the Massive Baku Stadium in 18 Months

    The only way to achieve maximum efficiency at just as 18 months would be implementing BIM.

    Read Article
  • Georgia Tech Practice Facility: Creative Thinking Fast-Tracks Georgia Tech Football Facility

    Georgia Tech Practice Facility: Creative Thinking Fast-Tracks Georgia Tech Football Facility

    The successful separation and subsequent schedule gains were made possible through the efficiency and transparency of Tekla’s BIM solutions.

    Read Article
  • Fondation Louis Vuitton: A Dream Come Constructable

    Fondation Louis Vuitton: A Dream Come Constructable

    BIM increased clarity and project understanding throughout the project team and supply chain, resulting in faster cycle times and more automated higher-quality fabrication processes.

    Read Article
  • Expo 2010 Finland Pavilion: Tekla Structures BIM Software Used to Model and Manage its Structural Information in 3D

    Expo 2010 Finland Pavilion: Tekla Structures BIM Software Used to Model and Manage its Structural Information in 3D

    Tekla was chosen for the modeling of the project because we needed a tool that will best help us disassemble the challenging structure later and to document the whole process.

    Read Article
  • Eagle Ridge Residential Development - A Design-To-Fabrication Precast Concrete Project Carried Out Completely within Tekla's BIM Software

    Eagle Ridge Residential Development - A Design-To-Fabrication Precast Concrete Project Carried Out Completely within Tekla's BIM Software

    Kassian Dyck & Associates could not have detailed the total precast building to the fast-track schedule without the extensive 3D modeling benefits provided in Tekla Structures.

    Read Article
  • Crusell Bridge - Collaboration Is Crucial for using BIM Successfully in Construction

    Crusell Bridge - Collaboration Is Crucial for using BIM Successfully in Construction

    Openness between design and construction teams helped learn more about building information modeling (BIM) and find good practices in the Crusell bridge project.

    Read Article
  • Chennai Annadurai International Airport Expansion: Design-To-Fabrication Steel Project Carried Out within Tekla BIM Software

    Chennai Annadurai International Airport Expansion: Design-To-Fabrication Steel Project Carried Out within Tekla BIM Software

    Rapidly producing shop drawings and managing the project timeline were both accomplished using Tekla Structures software, which proved to be highly productive.

    Read Article
  • Cardno Buckland Chose 3D Modeling as a Way of Working to Support Industry Transistion to BIM and Interoperability

    Cardno Buckland Chose 3D Modeling as a Way of Working to Support Industry Transistion to BIM and Interoperability

    The company chose 3D modeling as a way of working to support Australian mining and commercial industries in moving towards BIM and 3D models as final delivery.

    Read Article
  • loading
    Loading More...