Featured Content

  • Dimension Fabricators Uses Truly Constructible BIM For Faster, Accurate Modeling Of Complex Rebar Structures

    Dimension Fabricators Uses Truly Constructible BIM For Faster, Accurate Modeling Of Complex Rebar Structures

    Read Article
  • At Oostingh Staalbouw, Information is Always Up-to-Date

    At Oostingh Staalbouw, Information is Always Up-to-Date

    With Model Sharing it’s easy to share and monitor the progress of production and erection.

    Read Article
  • PTDC Logistics Center Project has Made Extensive Use of BIM Throughout the Supply Chain

    PTDC Logistics Center Project has Made Extensive Use of BIM Throughout the Supply Chain

    The model enabled us to forecast and manage element deliveries and to check the status in real time, so we knew whether we were will be able to install the element on time.

    Read Article
  • How Estimodeling Saved Time and Improved Accuracy in Ski Dubai Detailing

    How Estimodeling Saved Time and Improved Accuracy in Ski Dubai Detailing

    Faster product development, lower cost, and improved productivity are issues addressed by Tiger Steel.

    Read Article
  • ×


    Constructible Info Directly to Your Inbox

    First Name
    Last Name
    Company
    Info to transform the way you work:
    Error - something went wrong!
  • 30% Efficiency Gain on Football Stadium Construction

    30% Efficiency Gain on Football Stadium Construction

    One of the biggest challenges in the project was fabrication of the twisted and cambered beams which required exact coordinates control in more than twenty points.

    Read Article
  • Saipem Oversees Entire Offshore Projects with BIM

    Saipem Oversees Entire Offshore Projects with BIM

    The most significant benefit is the availability of a single structural model from which we can extract project plans and detailing, lists of materials, weights and centers of gravity.

    Read Article
  • High Concrete Group Bring Award-Winning Intrepid Project to Life with Efficiency and Accuracy

    High Concrete Group Bring Award-Winning Intrepid Project to Life with Efficiency and Accuracy

    With Tekla Structures, High Concrete Group’s BOM were more accurate and delivered three weeks earlier, giving the company more time to purchase and prepare supplies.

    Read Article
  • Use of BIM on a Construction Site was Put to the Test with a Jumbo Shopping Center Extension

    Use of BIM on a Construction Site was Put to the Test with a Jumbo Shopping Center Extension

    A tight timetable meant that the design, purchasing, prefabrication and site activities ran very much in parallel.

    Read Article
  • Puuvilla: From Factory to Shopping Center with BIM collaboration

    Puuvilla: From Factory to Shopping Center with BIM collaboration

    The precast concrete provider Parma faced a very tight schedule, a challenge which they tackled with collaboration, design, detailing and production status management and model information.

    Read Article
  • Project OVE:  Arup's 170-meter-tall BIM man

    Project OVE:  Arup's 170-meter-tall BIM man

    OVE is the embodiment of implementing BIM to construction projects with elaborate geometries, unorthodox design challenges and unique aesthetics.

    Read Article
  • Ruby+Associates Relied on Tekla Structures to Complete the Hard Rock Stadium Canopy

    Ruby+Associates Relied on Tekla Structures to Complete the Hard Rock Stadium Canopy

    The construction sequence was developed to keep the loads imposed on critical portions of the canopy structure in balance, allowing work to proceed independently in each corner of the structure.

    Read Article
  • Recreation Center Flamingo: BIM Adds Momentum to the Construction Site of the Year

    Recreation Center Flamingo: BIM Adds Momentum to the Construction Site of the Year

    Production planning and utilization of the building’s information model (BIM) have been exemplary throughout the project.

    Read Article
  • Ramboll Group: Thorough Implementation of 3D Modeling

    Ramboll Group: Thorough Implementation of 3D Modeling

    Using a proper 3D design tool ensures the consistency of the structure with technical models, such as the HVAC model, and greatly reduces errors caused by redundant data.

    Read Article
  • Quatre-Temps Commercial Center: Gagne Used Tekla Structures Software to Model Complex Frameworks

    Quatre-Temps Commercial Center: Gagne Used Tekla Structures Software to Model Complex Frameworks

    Gagne needed software to model complex frameworks (3 items modeled simultaneously), thus ensuring highly effective detailing and optimized fabrication of this exceptional structure.

    Read Article
  • Pinnacle Engineering Consolidates Software Packages and Increases Productivity

    Pinnacle Engineering Consolidates Software Packages and Increases Productivity

    It allows us to collaborate without friction and instantly understand the impact of any changes so we can make informed decisions and ultimately, deliver the best result possible to our client.

    Read Article
  • The PGE Arena in Gdansk: A Sports Arena Modeled Using Tekla BIM Software

    The PGE Arena in Gdansk: A Sports Arena Modeled Using Tekla BIM Software

    BIM enabled us to optimize both time and materials and tackle assembly challenges before entering the site.

    Read Article
  • Peace Bridge: BIM helped Rowecord with Complex Geometry, Off-site Building and Even Transportation

    Peace Bridge: BIM helped Rowecord with Complex Geometry, Off-site Building and Even Transportation

    The accuracy of the model and the control over the geometry during fabrication and erection were major contributors to the success of the Peace Bridge project.

    Read Article
  • Panorama Tower - Reliable Modeling Helps to Avoid Mistakes

    Panorama Tower - Reliable Modeling Helps to Avoid Mistakes

    A number of new functions were utilized in the building information modeling environment implemented in the structural design to seek efficiency in both the site functions and building cost factors.

    Read Article
  • Modeling the Steel Structures of North East Tower (NET) Center with Tekla Structures Helped Achieve Architectural Objectives

    Modeling the Steel Structures of North East Tower (NET) Center with Tekla Structures Helped Achieve Architectural Objectives

    The major improvements has been the increased quality of their work due to the absence of errors, an increase in precision and efficiency, and a reduction in turn-around times for their projects.

    Read Article
  • ×


    Constructible Info Directly to Your Inbox

    First Name
    Last Name
    Company
    Info to transform the way you work:
    Error - something went wrong!
  • No Blue Planet without Building Information Modeling

    No Blue Planet without Building Information Modeling

    With 3D modeling, all parties are involved in creating the design of the project in a completely new way. This leads to a deeper understanding of the project, which improves the quality.

    Read Article
  • loading
    Loading More...